site stats
100 MW / 200 MWh of Megapacks have been delivered and installed at Cheviré site, located in the port of Nantes. The facility will be operated by Autobidder and will be the France’s first large-scale 2-hour battery system 📷
sign_in_with_google sign_in_with_google

2475 位用户此时在线

24小时点击排行 Top 10:
  1. 本站自动实时分享网络热点
  2. 24小时实时更新
  3. 所有言论不代表本站态度
  4. 欢迎对信息踊跃评论评分
  5. 评分越高,信息越新,排列越靠前